Food Production Facility, Carlisle

Multiple jobs carried out on a food production facility in Carlisle.

Project Overview

Strip out of existing roof and in rack sprinkler protection, redesign of protection.

Strip out, upgrade and extension of existing system
Industrial

What we did

Strip out of existing roof and in rack sprinkler protection. The protection was then redesigned to upgrade roof protection from 7.5mm/min over 260m² design density to 10mm/min over 260m² complete with new installation control alarm valve to client requirements and connecting pipework. New in rack sprinkler protection was then installed within extended racks in accordance with TB234 ST4 requirements fed from existing installation control alarm valve. All pipework gloss painted to client specification.

Thank you for choosing to work with us!


To begin please proceed to fill in this enquiry form and someone will contact you.

Please start by submitting your contact information.

If you selected Firm Enquiry please submit dates in the following two boxes; otherwise please ignore.

That's all the questions answered, please now press submit and a member of our service team will be in touch.