Case Study
Project Specifics
The project involves the installation of a comprehensive fire protection system across the facility, incorporating over 4,300 sprinkler heads strategically positioned across the roof, canopies, and office areas. The system is supported by eight valve sets complete with bypasses, ensuring operational flexibility and reliability. Water supply is provided via two diesel-driven pump sets, drawing from two 498 m³ tanks with a combined capacity of 996 m³, housed within a GRP sprinkler pumphouse. In addition, the project includes an FM200 gas suppression system designed to protect IT and server rooms, as well as the installation of fire hydrants and mains to deliver full coverage across the site.