Project

Artex Limited

Removal of old, and installation of new equipment.

Project Overview

Removal and decommission of existing water supplies. Supply and installation of new pump sets, pipework and valves drawing water from a new 453m3 full holding capacity tank.

All civil works (tank base & pump plinths etc.)
Industrial

What we did

Removal of existing sprinkler equipment from existing pump house and dismantle sprinkler tank. Undertake repairs to existing tank base and pump plinths in readiness for the supply and installation of 2 new diesel driven pump sets, valve sets and pumphouse pipework, all electrical works as required all of which draw water from a 453m3 capacity full holding capacity sprinkler tank.